This operation manual applies to our industrial high pressure water jet hydro blasting machine. It covers pre-start preparation, running operation steps, shutdown procedure, common fault diagnosis and routine maintenance requirements to help operators use the equipment safely, reduce breakdowns and extend service life.

Pre-operation Preparation
- Fill the high-pressure pump power end with lubricating oil. The recommended oil grade is 15W-CD40 diesel engine oil. The oil level shall not be lower than 2/3 of the oil sight glass.
- Check the water tank level via the water sight glass to ensure sufficient water supply during operation.
- Connect all pipelines: one end of the high-pressure hose connects to the high-pressure pump outlet, the other end connects to the foot control valve; the foot control valve is further connected to the flexible gun or rigid steel gun.
Note: Do NOT install the nozzle before pipeline flushing. Start the machine to flush pipelines first to remove impurities and avoid nozzle damage.
- Connect the water inlet pipe to the inlet port of the high-pressure pump.
- Connect the power cable.
- Double-check all connections: confirm the pressure gauge returns to zero, water source and power supply are well connected. Open the air vent valve before water enters the pump to exhaust air inside the pipeline.
Running Operation Procedure
- Press the start button on the electric control box and quickly press the stop button afterwards. Check whether the rotation direction of the motor matches the direction marked on the coupling. If consistent, the machine can be used. If reversed, swap any two live wire positions of the cable to correct rotation direction.
- Press the start button. After the indicator light turns on and the pump runs steadily, the operator steps on the foot control valve to start pressure adjustment following the marks on the pressure regulating valve. Watch the pressure gauge in real time. Stop adjustment and lock the regulating valve once the target working pressure is reached, then the machine starts formal cleaning work.
- Monitor the water level of the water tank continuously during operation.
Common Abnormality
Hose shaking during operation
- Worn internal vulnerable parts of the pump (poor sealing of valve seat and valve core)
- Air trapped inside the inlet pipe
- Blocked water inlet filter screen
- Pipeline leakage
No pressure after startup
- No nozzle installed
- Nozzle bore diameter too large
- Pipeline or nozzle blocked
- Damaged pressure gauge
- Water supply failure, no water entering the pump
- Filter blocked, clean the filter immediately
- Foot control valve not stepped down, pressure cannot be adjusted
Shutdown Procedure
Release the foot control valve to drop pressure to zero, loosen the pressure regulating valve, press the stop button on the electric control box and cut off the power supply. Disassemble and store hoses, spray guns and other accessories properly.
Important Notes & Routine Maintenance
- Use rigid steel gun for pipe opening cleaning; flexible gun is recommended for internal pipe cleaning.
- When using a flexible gun, tie a rope mark at 1 meter from the nozzle. This prevents operators from pulling out the flexible gun and nozzle accidentally.
- Lubricating oil cycle: First oil change within 50~80 working hours; replace oil every 200 working hours afterwards.
- Clean the filter screen at the water inlet regularly according to water quality condition.
- Drain all water from the high-pressure pump and water tank if the machine will be idle for a long time. Cover the cleaned filter with plastic cloth or dust-proof cover for protection.
If you need technical support, spare parts supply or customized training for high pressure water jet equipment, feel free to contact our engineering team.